Wastewater Department Projects

The Wastewater Department will be replacing aging sanitary sewer mains, manholes, and service connections at the following locations between May and November 2018.

1. Rhubena Street
This project includes replacement of 180 feet of the existing 6-inch vitrified clay sanitary sewer main installed in 1916 with 6-inch PVC sewer main and replacement of service connections from the sewer main to the property line.

2. Waverly Court
This project includes replacement of 400 feet of the existing 6-inch and 8-inch vitrified clay sanitary sewer mains installed in 1932 with 6-inch and 8-inch PVC sewer mains and replacement of service connections from the sewer main to the property line.